Brief Description::The project consists of a 4,000SF new masonry framed office building with utility brick as exterior finishes. The interior spaces included offices, work rooms, crew rooms, toilets and showers along with new MEP system and enclosed shop to for vehicle maintenance. The finishes included new epoxy floor system, vct, ceramic tile, acoustic ceiling systems, and lighting throughout. The new building exterior consisted of storefront window system along with new metal joist and TPO roof system. This scope also included approximate 5,000SF equipment shelter and included renovation of an existing 2,000SF Maintenance building. The site included new utility system, landscaping, walkway canopy, fencing enclosures, retaining walls, curb/gutter and pavement system for an approximate 4 acre site.
Location::Jamestown, NC
Project Delivery::General Contracting
Size::(3) Buildings 12,000 GSF
Project Schedule::12 Months
Architect::Robbins Architecture P.A.