Brief Description | This scope of work included 10,500 SF of renovated and 1,400 SF of new building construction. The renovation scope included general upfit construction, limited selective demolition, site/civil work, site utility work, plumbing, mechanical, controls and electrical work. New construction scope of work consisted of a new 1,400 SF load-bearing masonry building, w/steel roof structure and decking, and PVC membrane roofing system. New mechanical equipment to support a new campus Hot-Water Distribution System serving four (4) existing buildings. |
Location | Winston-Salem, NC |
Project Delivery | General Contracting |
Size | 11,900 SF |
Project Schedule | 12 Months |
Architect | Ersoy Brake & Appleyard Architects |
Brief Description | The construction of a home side concession stands and toilet room buildings that consists of 2,720 SF building that is single story, non-sprinkled. Sitework work included utilities, parking, driveways and landscaping. The concessions and toilet room building included concession stand, storage, men’s and women’s toilet facilities. New Plumbing, Mechanical and Electrical. |
Location | Statesville, NC |
Project Delivery | General Contracting |
Size | 2,720 SF |
Project Schedule | 6 Months |
Architect | Adams & Associates Architecture |
Brief Description | This scope of work included a new 17,310 SF Agricultural Pavilion. The facility houses offices spaces and laboratory spaces for research preparation. Seminar room, multipurpose room, instructional spaces and dining capabilities with a seating capacity for 300 banquet style seating. The structure also has restrooms, a warming kitchen, storage and utility spaces. Parking, landscaping and access to other parts of the Farm considered. |
Location | Greensboro, NC |
Project Delivery | General Contracting |
Size | 17,310 SF |
Project Schedule | 16 Months |
Architect | Norwood Architecture |
Brief Description | The work consists of a 5,300SF new building to provide softball training. The new construction included exterior brick and precast, metal roof system, pre-engineered steel, overhead doors, storefront system, new mechanical, electrical, and plumbing. Site Improvement Including Landscaping and Retaining Wall. |
Location | Charlotte, NC |
Project Delivery | General Contracting |
Size | 5,300 SF |
Project Schedule | 6 Months |
Architect | McMillan Pazdan Smith Architecture |
Brief Description | The work consists of a new 2 acre plaza that included outdoor lawn seating, lawn space, water fountain, seat walls, and a performance area. The plaza is landscaped in an effort to improve pedestrian and bike traffic along with allowing outdoor study and leisure for students. |
Location | Charlotte, NC |
Project Delivery | General Contracting |
Size | Approx. 2 Acres |
Project Schedule | 5 Months |
Architect | McAdams |
Brief Description | The project consists of a new 2 acre 25 space parking lot expansion of the existing lot #8. The scope included asphalt paving, storm drainage system, concrete pads, brick pavers, curb and gutter, striping and bike racks. New landscaping and exterior lighting was also added to increase visibility. |
Location | Charlotte, NC |
Project Delivery | General Contracting |
Size | Approx. 2 Acres |
Project Schedule | 4 Months |
Architect | McAdams |
Brief Description | The project consists of a 43,205 SF of new classrooms wings additions including administrative offices and approx. 1,225 SF of additional cafeteria dining space. The project also consists of a new parent drop off and pickup drivee lanes and a new school bus parking area. |
Location | Laurinburg, NC |
Project Delivery | General Contracting |
Size | (4) Buildings 44,500 SF |
Project Schedule | 13 Months |
Architect | Pinnacle Architecture, P.A. |
Brief Description | The project consists of the construction of an new elevator/stairway addition, Renovation to existing classrooms, restrooms and hallway on the 1st and 2nd Floors. The renovation included but not limited to new lighting, new ceiling grid, reworking the existing restrooms including new terrazzo flooring with ceramic tile on walls. The scope of work also included a new HVAC system, replacement of all windows on 1st and 2nd Floors and epoxy flooring. |
Location | Sparta, NC |
Project Delivery | General Contracting |
Size | 31,000 GSF |
Project Schedule | 7 Months |
Architect | Pinnacle Architecture, P.A. |
Description | The project consists of the construction of interior renovations of Cox Hall including two relocated teaching labs from Harrelson Hall. The new lab space is located on the first floor of Cox Hall. The 12,000 SF space in Cox Hall included demolition of the existing office suite and modifications to the interior corridor and mechanical rooms. The renovated space consisted of new male/female toilet rooms, two active labs, storage, lactation room, and other miscellaneous work. The project was extremely fast track to accommodate the staff relocation from other facilities. |
Location | Raleigh, NC |
Project Delivery | General Contracting |
Size | 12,000 SF |
Project Schedule | 4 Months |
Architect | Oakley Collier Architects P.A. |
Description | This scope of work included 122,000 Square Foot of renovated interior and exterior space. The interior changes included adding new classrooms, lecture hall, renovated restrooms, new elevator, renovated locker rooms, renovated gymnasium, and renovation of the existing aquatic area. The scope also included adding modern air-conditioning systems, plumbing and electrical systems. The exterior consisted of new panel roof system, hardscapes, exterior facade renovation, and the addition of approximate 8,000 Square Foot Entrance into the building. |
Location | Charlotte, NC |
Project Delivery | CM @ Risk Joint Venture |
Size | 130,296 SF |
Project Schedule | 16 Months |
Architect | C Design, Inc. |
Description | The work consists of the interior renovation of four floors of an existing building to provide new office and conference space. Renovation included upgrading the existing mechanical, electrical, and plumbing systems along with the installation of all new wall and floor finishes at each floor. At the exterior of the building new storefront systems were installed along with renovations to the existing parking lot and entrance of the building. |
Location | Chapel Hill, NC |
Project Delivery | General Contracting |
Size | 22,000 SF |
Project Schedule | 10 Months |
Architect | Symmes Maini & McKee Associate |
Description | The work of this award winning project is generally described as a new carillon and clock tower that is approximately 144 square feet with a total height of 85 feet. The tower includes the construction of cast in place concrete footings, steel structural frame, glazed brick veneer, translucent glass, composite metal panels, precast, LED clock mechanism and has an amplified electronically simulated carillon system at the top of the tower all designed to reflect wind loads. The lighting system was constructed of LED lighting with multifaceted color lighting which illuminates in NCA&T’s school colors of Blue, Gold, and White. |
Location | Greensboro, NC |
Project Delivery | General Contracting |
Size | 144 SF, 85’ Tall |
Project Schedule | 8 Months |
Architect | Vines Architecture Inc. |
Brief Description | Renovation to existing lecture hall & auditorium seating. |
Location | Winston-Salem, NC. |
Project Delivery | General Contracting |
Size | 3,000 SF |
Project Schedule | 5 Months |
Architect | Ersoy, Brake & Appleyard |
Brief Description | Interior & exterior renovation of an early childhood development center. New EFIS. |
Location | Mocksville, NC. |
Project Delivery | General Contracting |
Size | 3,000 SF |
Project Schedule | 8 Months |
Architect | Clinton Gravely Architects |
Brief Description | Installation of Pre-Engineered Maintenance Facility Building for the Athletic Department. |
Location | Charlotte, NC |
Project Delivery | General Contracting |
Size | 3,000 SF |
Project Schedule | 5 Months |
Architect | Jenkins Peer Architects |
Brief Description | Removal of existing natural grass field & existing irrigation system. Site drainage improvements, installation of new irrigation system and sports lighting, fencing and new natural grass athletic field. |
Location | Greensboro, NC. |
Project Delivery | General Contracting |
Size | 100,000 SF |
Project Schedule | 5 Months |
Architect | CHA Consulting |
Brief Description | Renovation to expand space on the third floor of the School of Education building, and to create a new Makerspace, including an open, creative space with flexible, rolling tables and chairs, lots of storage for tools and supplies, and new tools such as a 3D printer. |
Location | Greensboro, NC. |
Project Delivery | General Contracting |
Size | 3,000 SF |
Project Schedule | 3 Months |
Architect | Kirwan Architecture |
Brief Description | Renovation to first floor of the R. J. Reynolds Center to include a trading room equipped with twenty-six work stations with dual screen monitors, a world clock with local time in worldwide financial markets, an NYSE ticker tape, and wall panels displaying current stock and bond prices and news. |
Location | Winston-Salem, NC. |
Project Delivery | General Contracting |
Size | 3,000 SF |
Project Schedule | 6 Months |
Architect | Norwood Architecture & Design |
Brief Description | Exterior restoration and renovation to historical alumni house which included brick repair, new roof and gutter system, and installation of a new porch along with exterior trim restoration. |
Location | Winston-Salem, NC. |
Project Delivery | General Contracting |
Size | 6,000 SF |
Project Schedule | 5 Months |
Architect | David E. Gall Architects |
Brief Description | This scope of work included 55,000SF of renovated interior and exterior space. The interior changes included adding new classrooms, renovation of library, offices spaces, restrooms, multipurpose room, cafeteria and the existing laboratories. The scope also included adding modern air-conditioning systems, plumbing, and electrical systems and new culinary kitchen facility with all new kitchen equipment. The finishes included new epoxy floor system, sports floor system, VCT carpet, ceramic tile, acoustic ceiling systems, and lighting throughout. The exterior consisted of new storefront window system, TPO roof system, hardscapes, exterior facade renovation, and the renovation of approximate 10,000 square foot exterior basketball court system. |
Location | Wake Forest, NC |
Project Delivery | General Contracting |
Size | 55,000 SF |
Project Schedule | 6 Months |
Architect | LS3P Associates LTD |