Brief Description | Phase two of the park will included a dog park, primitive campsites with restroom and shower facilities, additional walking trails, two additional small shelters, and a disc golf course on the Hood-Chamberlain Dam side of the park that have parking and restroom facilities. |
Location | Yadkinville, NC |
Project Delivery | General Contracting |
Size | n/a |
Project Schedule | 6 Months |
Architect | Alfred Benesch & Company |
Brief Description | This scope of work included a new 6,500 SF visitor center. The building consists of new offices, exhibit hall, restrooms and parking for visitors to Pilot Mountain. The building construction included a combination of loadbearing cmu block, steel frame with glulam wood beams, wood stud framing, 3” exposed wood decking and standing seam metal roof system (at exhibit hall area), wood trusses with 30 year architectural asphalt shingles at administration area. Exterior materials included a combination of manufactured stone veneer, cement fiber vertical & horizontal siding, aluminum clad wood casement windows, storefront and curtain wall. New pluming, mechanical and electrical. |
Location | Pinnacle, NC |
Project Delivery | General Contracting |
Size | 6,500 SF |
Project Schedule | 16 Months |
Architect | ADW Architects |
Brief Description | This scope of work included a new 13,250 SF visitor center. The building consists of new offices, exhibit hall, restrooms and parking for visitors. The building construction included a combination of loadbearing cmu block, steel frame with standing seam metal roof system. Exterior materials included a combination of manufactured Polished CMU, cement fiber vertical & horizontal siding, aluminum windows, storefront and curtain wall. New plumbing, mechanical and electrical. |
Location | Huntersville, NC |
Project Delivery | General Contracting |
Size | 13,250 SF |
Project Schedule | 16 Months |
Architect | BB&M Architecture |
Description | The project consists of the construction of an 8,000 Square Feet gymnasium addition to an existing recreation center. The interior included new fire suppression, mechanical, plumbing, and electrical system. Also on the interior new a bathroom facilities, storage room, gym equipment, and basketball court where all added in the addition. The exterior consist of new exterior site lighting, parking lot, hardscapes, and landscaping.. The project scope included masonry wall construction and TPO roof system on metal joist system. |
Location | Kernersville, NC |
Project Delivery | General Contracting |
Size | 8,000 SF |
Project Schedule | 8 Months |
Architect | Peterson/Gordon Architects, PA |
Description | The work consist of renovation to an existing park that included sitework, retaining walls, hardscapes, walking trails, basketball courts, fencing, parking lot, and landscaping of a 5 acre site. The park also included new picnic shelters, playground facility, benches, tables and interior renovation of an existing bathroom building. The primary attraction was the installation of an approximate 8,000 square foot splash pad system with multiple water features. |
Location | Lexington, NC |
Project Delivery | General Contracting |
Size | 5 Acres |
Project Schedule | 8 Months |
Architect | Alfred Benesch & Company Inc. |
Brief Description | Renovation to historical museum in the Lindsay Wing including the installation of new windows and exterior/interior trim as well as exterior brick repairs. |
Location | Greensboro, NC. |
Project Delivery | General Contracting |
Size | 10,000 SF |
Project Schedule | 6 Months |
Architect | Sutton-Kennerly & Associates Engineering |
Brief Description | Installation of pre-fabricated glulam structure for a religious facility. |
Location | Colfax, NC. |
Project Delivery | General Contracting |
Size | 3,000 SF |
Project Schedule | 5 Months |
Architect | Michael R. McLeod, AIA Architect |
Brief Description | Renovation to existing club house and installation of viewing deck for sports facility. |
Location | Greensboro, NC. |
Project Delivery | General Contracting |
Size | 3,000 SF |
Project Schedule | 5 Months |
Architect | Sutton-Kennerly Architects |
Brief Description | The project consists of interior and exterior renovations of a two story 13,000SF building including the installation of a new elevator system in an existing building. The 13,000 SF space included complete demolition of the existing floor/interior wall systems with a new wood floor joist/wall framed system and to the interior of the building including a barreled ceiling leading into the lobby and coffer ceiling in the meeting rooms with wood trim throughout. The finishes included new LVT floor system, carpet, sprayed acoustic ceiling systems, projector screens, and chandelier lighting throughout. The renovated space consisted of new male/female toilet rooms, meeting rooms on both levels, bridal room, large hosting rooms at main level, lobby area and office spaces. The exterior consisted of new doors and glass block windows installation along with painting of the exterior building. |
Location | Morganton, NC |
Project Delivery | General Contracting |
Size | 13,000 SF |
Project Schedule | 7 Months |
Architect | Glazer Architects P.A. |
Brief Description | The work consists of interior upfit of approximately 8,000SF of a new building to provide new theater and studio space. The upfit included new mechanical, electrical, and plumbing systems along with the installation of all new wall and floor finishes at each area. The finishes included new wood floor system, carpet, ceramic tile, acoustic ceiling systems, and lighting throughout. This scope also included new storefront systems, performance lighting system, theater seating, acoustic ceiling/wall system, pipe grid system, performance curtain system and veneer wood panels as some of the highlights of the interior upfit. |
Location | Chapel Hill, NC |
Project Delivery | General Contracting |
Size | 8,000 SF |
Project Schedule | 10 Months |
Architect | Lord, Aeck, & Sargent Inc. |